Pre Loader

In the case of studying or installing underground pipelines, the tasks are multiple and they include, in particular, the establishment of the main project plan, land crossing negotiations (servitude), natural ground measurement, existing land survey, pipeline study (length and plan profiles) Control of pipeline installation, realization of as-built plans and welding or joining books, etc.
All the tasks of assistance besides the management of the work (measurements, detection of already existing pipelines, Pearson test) or maintenance for The plants responsible for the installation (site before and after work) can be carried out by EXCELTOP.